111 Highland Meadows under construction in Williams, Arizona
Build Cam · No. 19

Watch it go up. Every month.

111 Highland Meadows, a mountain home on the pond at the 14th hole of Elephant Rocks Golf Course in Williams. A new update posts every month until it’s done.

StatusFinishes going in
CompletionEst. late 2026
Home3 bd / 3.5 ba · 3,288 sf
Garage1,863 sf · RV bay 16 ft clear
Price$1,899,900
Now · October 2026

Finishes going in

The exterior is complete, drywall is being finished, and tile is starting. Next comes cabinetry, the selections from the boards below, and the RV bay door.

September 2026

Walkthrough before drywall

Up to the stone entry, into the great room with its wall of glass facing the pond, up to the loft, and out back to the 14th hole, filmed while the walls were still open.

Walkthrough of 111 Highland Meadows before drywallPre-drywall walkthrough
Stage

The shell: stone, roof and the RV bay

Stone veneer outside, the roof on, and the RV bay with 16 feet of clear height and a 13’6” by 14’ door. Spray foam insulation goes into the house and the garage for Williams winters.

111 Highland Meadows with stone going upThe garage side of 111 Highland MeadowsThe deck looking over the pond at Elephant Rocks
Stage

The design boards

Before anything was ordered, Jovian built a selection board for every room: matte black and brushed brass, warm wood, stacked stone, and a concrete soaking tub.

Kitchen selection boardPrimary bath selection boardExterior selection board
Where it started

The lot on the 14th hole

A lot backing onto the pond at the 14th hole of Elephant Rocks Golf Course, with no rear neighbor, just water, fairway and pines.

The 111 Highland Meadows lot before construction

Owner/Agent: 111 Highland Meadows is owned by an LLC whose principals are Jose and Jovian Moran, listed by Team Moran, Infinitude Realty, LLC. Pre-construction, not yet on MLS. Plans, selections and completion timing may change during construction.

Monthly updates

Get each update when it posts.

One email a month with the new video and photos from the site. Most buyers at this level watch a build for months before they commit; this is the easy way.

One email a month while it’s building. Reply “stop” anytime.

Call Start a Project